SI.No | Power demand | Total cost using GA method | Total cost using hybrid method |
MW | $/hr | $/hr | |
1 | 150 | 513.9195 | 459.7613 |
2 | 180 | 801.8116 | 548.0276 |
3 | 200 | 771.6955 | 377.6988 |
4 | 230 | 711.1035 | 703.5854 |
5 | 250 | 755.7312 | 685.5941 |
6 | 260 | 801.1265 | 736.6453 |
7 | 300 | 858.1526 | 851.3701 |
8 | 340 | 981.0335 | 909.1563 |
9 | 350 | 1298.1529 | 1051.7908 |
10 | 400 | 1132.032 | 1077.1109 |