| Section # | Name | RSMS Repair Strategy | Chosen Repair Option | RSMS Budget ($) | Reason for Selection |
| 1 | 6th St | Routine | Crack seal | 8688 | -cost effective -addresses the current long/tran cracks in the section -fits the overall good road surface condition -good typical life cycle performance 3 - 5 years |
| 2 | Perimeter Dr | Preventive | Chip seal (Latex modified) | 81,281 | -can waterproof the surface -can restore surface friction -relatively more cost effective than an overlay -provide sealing to low severity cracks -good typical performance life 4 - 7 years -provide opportunity to apply multiple treatments |
| 3 | Stadium Dr | Preventive | Chip seal (Latex modified) | 43,250 | -can waterproof the surface -can restore surface friction -relatively more cost effective than an overlay -provide sealing to low severity cracks -good typical performance life 4 - 7 years -provide opportunity to apply multiple treatments |
| 4 | Rayburn St | Preventive | Chip seal (Latex modified) | 28,120 | -can waterproof the surface -can restore surface friction -relatively more cost effective than an overlay -provide sealing to low severity cracks -good typical performance life 4 - 7 years -provide opportunity to apply multiple treatments |
| 5 | Line St | Routine | Crack seal | 9790 | -cost effective -addresses the current long/tran cracks in the section -fits the overall good road surface condition -good typical life cycle performance 3 - 5 years |
| 6 | Blake Ave | Rehabilitate | Shim w/2” overlay | 122,363 | -improves road profile, crown, and slopes -corrects rutting and other surface distresses -reworks the AC to depth of 2 in -Typical performance 5 - 10 years -more cost effective than mill and fill 1.25” or overlay w/cold mix 2” and hot mix top 1” |
| 7 | Deakin Ave | Rehabilitate | Shim w/2” overlay | 140,400 | -improves road profile, crown, and slopes -corrects rutting and other surface distresses -reworks the AC to depth of 2 in -Typical performance 5 - 10 years -more cost effective than mill and fill 1.25” or overlay w/cold mix 2” and hot mix top 1” |
| 8 | Idaho Ave | Rehabilitate | Shim w/2” overlay | 70,850 | -improves road profile, crown, and slopes -corrects rutting and other surface distresses -reworks the AC to depth of 2 in -Typical performance 5 - 10 years -more cost effective than other rehab methods like mill and fill 1.25” or overlay w/cold mix 2” and hot mix top 1” |
| 9 | University Ave | Rehabilitate | Shim w/2” overlay | 38,838 | -improves road profile, crown, and slopes -corrects rutting and other surface distresses -reworks the AC to depth of 2 in -Typical performance 5 - 10 years -more cost effective than other rehab methods like mill and fill 1.25” or overlay w/cold mix 2” and hot mix top 1” |
| 10 | Sweet Ave | Preventive | Chip seal | 16,198 | -can waterproof the surface -can restore surface friction -relatively more cost effective than an overlay -provide sealing to low severity cracks -good typical performance life 4 - 7 years -provide opportunity to apply multiple treatments |
| Total $ 559,778 |
| ||||