Section # 9 University Ave | Rehabilitate | Reclaim pavement, revert to gravel | 5975 |
Shim with 2 in overlay | 38,838 | ||
Reclaim incl 6 - 8 in base, 2 in binder, 1.5 in surface | 59,750 | ||
Reclaim incl 6 - 8 in base, stabilized, 2 in binder, 1.5 in surface | 73,194 | ||
PM RAP reclamation | 73,194 | ||
Section # 10 Sweet Ave | Preventive | Sand seal | 10,366 |
Chip seal (latex modified) | 16,198 | ||
Thin (3/4 - 1 in) overlay | 25,916 | ||
Shim with 1 in overlay | 42,114 | ||
Thick (>1 in) overlay | 46,649 | ||
Overlay w/2 in cold mix, top w/1 in HMA | 75,804 | ||
Mill and Fill 1.25 in | 80,988 |