Section # and Road Name | Repair Strategy | Repair Options | RSMS Estimated Cost in $ |
Section # 1 6th street | Routine | Patching | 869 |
Crack seal | 8688 | ||
Section # 2 Perimeter Dr | Preventive | Sand seal | 52,020 |
Chip seal (latex modified) | 81,281 | ||
Thin (3/4 - 1 in) overlay | 130,050 | ||
Shim with 1 in overlay | 211,331 | ||
Thick (>1 in) overlay | 234,090 | ||
Overlay w/2 in cold mix, top w/1 in HMA | 380,396 | ||
Mill and Fill 1.25 in | 406,406 | ||
Section # 3 Stadium Dr | Preventive | Sand seal | 27,680 |
Chip seal (latex modified) | 43,250 | ||
Thin (3/4 - 1 in) overlay | 69,200 | ||
Shim with 1 in overlay | 112,450 | ||
Thick (>1 in) overlay | 124,560 | ||
Overlay w/2 in cold mix, top w/1 in HMA | 202,410 | ||
Mill and Fill 1.25 in | 216,250 | ||
Section # 4 Rayburn street | Preventive | Sand seal | 17,997 |
Chip seal (latex modified) | 28,120 | ||
Thin (3/4 - 1 in) overlay | 44,992 | ||
Shim with 1 in overlay | 73,112 | ||
Thick (>1 in) overlay | 80,986 | ||
Overlay w/2 in cold mix, top w/1 in HMA | 131,602 | ||
Mill and Fill 1.25 in | 140,600 | ||
Section # 5 Line street | Routine | Patching | 712 |
Crack seal | 7120 | ||
Section # 6 Blake Ave | Rehabilitate | Reclaim pavement, revert to gravel | 19,076 |
Shim with 2 in overlay | 123,994 | ||
Reclaim incl 6 - 8 in base, 2 in binder, 1.5 in surface | 190,760 | ||
Reclaim incl 6 - 8 in base, stabilized, 2 in binder, 1.5 in surface | 233,681 | ||
PM RAP reclamation | 233,681 | ||
Section # 7 Deakin Ave | Rehabilitate | Reclaim pavement, revert to gravel | 18,468 |
Shim with 2 in overlay | 120,042 | ||
Reclaim incl 6 - 8 in base, 2 in binder, 1.5 in surface | 184,680 | ||
Reclaim incl 6 - 8 in base, stabilized, 2 in binder, 1.5 in surface | 226,233 | ||
PM RAP reclamation | 226,233 | ||
Section # 8 Idaho Ave | Rehabilitate | Reclaim pavement, revert to gravel | 10,900 |
Shim with 2 in overlay | 70,850 | ||
Reclaim incl 6 - 8 in base, 2 in binder, 1.5 in surface | 109,000 | ||
Reclaim incl 6 - 8 in base, stabilized, 2 in binder, 1.5 in surface | 133,525 | ||
PM RAP reclamation | 133,525 |