Operation

Volume lost (m3)

Formation strength (kPa/m)

Lost return when drilling to 2064.5 m with RSS BHA. Topped up annulus with water.

110

11.5

Perform wellbore strengthening, squeezed in 29.6 m3 LCM pill.

26.9

11.5

Perform second wellbore strengthening, squeezed in 19.7 m3 LCM pill.

16.2

11.5

Set cement plug from 2117 m to 1917 m.

8.2

11.75

Squeezed in 21 m3 of LCM pill in hesitation mode to record pump off pressure after every 100 litre.

21

11.45

Squeezed in 23.5 m3 of LCM pill in hesitation mode to record pump off pressure after every 100 litre.

23.5

11.59

Squeezed in 38.5 m3 of LCM pill in hesitation mode to record pump off pressure after every 100 litre.

38.5

11.68

Pumped and spot 15 m3 high fluid-loss LCM pill.

12.3

11.64

Pumped 30 m3 engineered LCM pill with 335 kg/m3 concentration and fiber.

20.5

12.01