No.

Name

Evaporation

Area

Evaporation (109 m3)

HP contribution Evaporation (109 m3)

mm/yr

Km2

Maximum

Expected

Maximum

Expected

Operational

1

Aba Samuel

1564.72

6.1761

0.01

0.004

0.005

0.002

2

Amerti Neshe

1493.971

22.8

0.034

0.014

0.016

0.007

3

Fincha

1497.209

345

0.517

0.207

0.242

0.097

4

Gibe-III

2015.988

200

0.403

0.161

0.189

0.075

5

Gilgel Gibe I

1685.076

51.06

0.086

0.034

0.040

0.016

6

Koka

1740.216

177

0.308

0.123

0.144

0.058

7

Melkawakena

1459.513

81.5

0.119

0.048

0.056

0.022

8

Tana Beles

1683.879

3120

5.254*

2.101*

0

0

9

Tekeze-1

1840.604

156.88

0.289

0.115

0.289

0.115

10

Tis-Abay-I

1683.879

3120

5.254*

2.101*

0

0

11

Tis-Abay-II

1683.879

3120

5.254*

2.101*

0

0

Total Operational

1.766*

0.706*

0.980*

0.392*

Under Construction

1

Genale Dawa-3

1817.498

98

0.178

0.071

0.083

0.033

2

GERD

2151.941

1561

3.359

1.344

3.359

1.344

3

Koysha

2082.768

286.882

0.598

0.239

0.280

0.112

Total Under Construction

4.134

1.654

3.722

1.489

Feasibility

1

TAMS

2164.46

203.041

0.439

0.176

0.205

0.082

2

Baro-1

1752.508

103.121

0.181

0.072

0.085

0.034

3

Baro-2

1841.879

6.231

0.011

0.005

0.005

0.002

4

Geba I

1685.962

115

0.194

0.078

0.091

0.037

5

Geba II

1821.454

1.8

0.003

0.001

0.001

0.000

6

Genale Dawa-6

2092.875

8

0.017

0.007

0.008

0.003

7

Hallele Werabesa I

1765.207

210

0.371

0.148

0.174

0.069

8

Hallele Werabesa II

1783.507

40

0.071

0.029

0.033

0.014

9

Gojeb

1874.398

48.578

0.091

0.036

0.043

0.017

10

Chemoga-Yada

1391.495

-

-

-

-

-

Total Feasibility

1.379

0.551

0.645

0.258