No.

Name

River Basin

Installed Capacity (MW)

No.

Name

River Basin

Installed Capacity (MW)

a. Operational

1

Aba Samuel

Awash

6.6

7

Melkawakena

Wabe Shebele

153

2

Amerti Neshe

Abay

97

8

Tana Beles

Abay

460

3

Fincha

Abay

134

9

Tekeze-1

Tekaze

300

4

Gibe-III

Omo Gibe

1870

10

Tis-Abay-I

Abay

12

5

Gilgel Gibe I

Omo Gibe

183.9

11

Tis-Abay-II

Abay

73

6

Koka

Awash

43.2

Total Functional

3332.7

b. Under Construction

1

Genale Dawa-3

Genale Dawa

254

3

Koysha

Omo Gibe

2160

2

GERD

Abay

6450

Total Under Construction

8864

c. Feasibility

1

TAMS

Baro Akobo

2000

7

Genale Dawa-6

Genale Dawa

246

2

Baro-1

Baro Akobo

180

8

Gojeb

Omo Gibe

153

3

Baro-2

Baro Akobo

500

9

Hallele Werabesa I

Omo Gibe

96

4

Chemoga-Yada

Abay

162

10

Hallele Werabesa II

Omo Gibe

326

5

Geba I

Baro Akobo

180

6

Geba II

Baro Akobo

157

Total Feasibility

3700

d. Other Planned (pre-feasibility, reconnaissance or identification stage)

1

Beko-Abo

Abay

935

8

Upper Dabus

Abay

326.28

2

Karadobi

Abay

1600

9

Lower Dedessa

Abay

550

3

Wabeshebele-18

Wabe Shebele

87.5

10

Lower Dabus

Abay

250

4

Beshilo

Abay

700

11

Birbir A

Baro Akobo

97.4

5

Tekeze-2

Tekeze

450

12

Birbir-R

Baro Akobo

467

6

Gibe-4

Omo Gibe

1472

7

Gibe 5

Omo Gibe

660

Total Other Planned

7709.15