No. | Name | River Basin | Installed Capacity (MW) | No. | Name | River Basin | Installed Capacity (MW) |
a. Operational | |||||||
1 | Aba Samuel | Awash | 6.6 | 7 | Melkawakena | Wabe Shebele | 153 |
2 | Amerti Neshe | Abay | 97 | 8 | Tana Beles | Abay | 460 |
3 | Fincha | Abay | 134 | 9 | Tekeze-1 | Tekaze | 300 |
4 | Gibe-III | Omo Gibe | 1870 | 10 | Tis-Abay-I | Abay | 12 |
5 | Gilgel Gibe I | Omo Gibe | 183.9 | 11 | Tis-Abay-II | Abay | 73 |
6 | Koka | Awash | 43.2 | Total Functional | 3332.7 | ||
b. Under Construction | |||||||
1 | Genale Dawa-3 | Genale Dawa | 254 | 3 | Koysha | Omo Gibe | 2160 |
2 | GERD | Abay | 6450 | Total Under Construction | 8864 | ||
c. Feasibility | |||||||
1 | TAMS | Baro Akobo | 2000 | 7 | Genale Dawa-6 | Genale Dawa | 246 |
2 | Baro-1 | Baro Akobo | 180 | 8 | Gojeb | Omo Gibe | 153 |
3 | Baro-2 | Baro Akobo | 500 | 9 | Hallele Werabesa I | Omo Gibe | 96 |
4 | Chemoga-Yada | Abay | 162 | 10 | Hallele Werabesa II | Omo Gibe | 326 |
5 | Geba I | Baro Akobo | 180 | ||||
6 | Geba II | Baro Akobo | 157 | Total Feasibility | 3700 | ||
d. Other Planned (pre-feasibility, reconnaissance or identification stage) | |||||||
1 | Beko-Abo | Abay | 935 | 8 | Upper Dabus | Abay | 326.28 |
2 | Karadobi | Abay | 1600 | 9 | Lower Dedessa | Abay | 550 |
3 | Wabeshebele-18 | Wabe Shebele | 87.5 | 10 | Lower Dabus | Abay | 250 |
4 | Beshilo | Abay | 700 | 11 | Birbir A | Baro Akobo | 97.4 |
5 | Tekeze-2 | Tekeze | 450 | 12 | Birbir-R | Baro Akobo | 467 |
6 | Gibe-4 | Omo Gibe | 1472 |
|
|
|
|
7 | Gibe 5 | Omo Gibe | 660 | Total Other Planned | 7709.15 |