Typical indication sites

Medium population regulation program(base)

Based on the medium water-saving scheme

Based on the high water-saving scheme

Scheme i

Scheme ii

Scheme iii

Scheme iv

Scheme v

Scheme vi

Tugou bridge

1.52

1.16

1.16

1.16

1.03

1.03

1.03

Houweigou bridge

2.10

1.44

1.57

1.44

1.37

1.37

1.31

NCR 1#

2.64

1.91

1.87

1.81

1.74

1.64

1.62

NCR 2#

3.15

2.36

2.25

2.19

2.14

1.98

1.96