| Year |
Measured Sediment Load 105 m3 |
Predicted Sediment Load (SWAT) 105 m3 |
Predicted Sediment Load (WEPP) 105 m3 |
Model |
Determination Coefficient (r2) |
Model Efficiency (Eff.) |
Index of Agreement (d) |
| 1997 |
1.70 |
1.41 |
1.99 |
SWAT
WEPP |
0.98
0.84 |
0.60
0.65 |
0.84
0.84 |
| 2001 |
0.23 |
0.86 |
0.48 |
||||
| 2003 |
1.40 |
1.34 |
0.88 |