Type of Control

Rise Time (second)

Settling Time (second)

Overshoot

Peak

Peak Time

(second)

Proposed control scheme

m = 25 & n = 3

0.001

0.0057

2.19%

1.040

0.0039

With Conventional PID control [45]

0.0030

0.9211

15.07%

1.1507

0.1327

With FOPID Control [45]

0.0034

0.9712

37.6215

1.3767

0.0086