Choice of the

location, design and technology proposed in the project should be duly well-grounded.

Due grounds should be provided, justifying the choice of the location proposed in the project together with the

proposed process and technology .

Due grounds shall be presented for the choices made.

Are the details of the EIA Report defined in the legislation?

The contents of the EIA Report are described in detail in the EIA legislation.

The contents of the EIA Report are described in detail in the EIA

legislation and in the Guide

The contents of the EIA Report are described in detail in the EIA legislation and in the Guide

The contents of the EIA Report are described in detail in the EIA legislation and in the Guide

The contents of the EIA Report are

described in detail in the EIA legislation.

The contents of the EIA Report are described in detail in the Directive. j, k

Are there

requirements for drawing up environmental management plans? If so what are the

respective details

Yes.

Yes.

Yes.

Yes.

Yes.

Specific legal

provisions for each Member State.

The Environmental Management Plan (EMP) will propose measures in order to eliminate, minimise and mitigate adverse impacts on the

environment,

including the

associated cost, scheduling and the entity responsible for implementation, including monitoring and implementation of environmental audits during the operation and

deactivation stages.

The Environmental Management Plan (EMP) will propose measures in order to eliminate, minimise and mitigate adverse impacts on the

environment, including the associated cost, scheduling and the entity responsible for implementation.

The Environmental Management Plan of the activity will include monitoring impacts, an

environmental

educational

programme and

accident

contingency plans.

The Environmental Management Plan (EMP) will contain information on:

According to Decree no. 51/2004, a supervision and

monitoring

programme of the

positive and negative impacts must be drawn up, indicating the factors and

parameters to be taken into

consideration.

・ the person responsible for drawing up the plan and evidence of his technical capacities for this task;

・ measures designed to manage or mitigate the environmental impacts foreseen in the planning and design, pre-construction, construction, operation stages, rehabilitation of the environment and de-activation (when suitable);