H

Reliability

Construction cost ($)

Exit gradient

d1

d2

b

b*

100

40%

93,811,995.8

0.280

65.02

85.18

158.46

71.76

93,403,373.0

0.282

56.51

88.54

92.46

91.59

80

40%

28,275,868.8

0.374

58.34

52.27

85.58

77.91

27,327,404.2

0.374

30.73

65.07

75.37

74.53

60

99.9%

57,740,766.3

0.342

37.93

80.34

61.05

47.25

56,752,425.9

0.343

71.71

62.54

86.34

46.50

40

60.0%

72,446,076.0

0.072

61.19

79.87

113.16

68.76

66,394,331.9

0.072

47.71

82.12

68.76

59.16

20

80.0%

40,547,213.5

0.073

34.53

73.33

23.75

12.63

40,367,765.1

0.074

72.09

41.34

39.87

29.61