Variables | 1 | 2 | 3 |
GPM | ROA | ROE | |
Constant | 0.074 | −0.072 | 0.081 |
Log affordability | 0.084 | 0.143 | 0.181 |
(0.813) | (1.401) | (1.754) | |
Log timeliness | 0.084 | 0.076 | (0.011) |
(0.787) | (0.725) | (0.104) | |
Log adequacy | 0.025 | 0.069 | (0.053 |
(0.236) | (0.662) | (0.499) | |
R | 0.152a | 0.224a | 0.167a |
R-Square | 0.023 | 0.05 | 0.028 |
Adjusted R-square | (0.003) | 0.025 | 0.002 |
F-Value | 0.874 | 1.962 | 1.066 |
DF | 3 | 3 | 3 |
Sig. F change | 0.457 | 0.124 | 0.366 |
Durbin Watson | 2.069 | 1.805 | 1.861 |