Peak period | Initial case | Final case | Performances (%) |
Bekoko transformer (%) | 93 | 62 | 33.33 |
Oyomabang-Ngousso line (%) | 130 | 81 | 37.69 |
Mangombe-Dibamba line (%) | 104 | 44 | 57.69 |
Necessary Capacitor banks | 7 | 3 | 57.14 |
Power losses (MW) | 59.88 | 48.85 | 18.42 |
Limbe power plant (MW) | 44 | 12 | 72.73 |
Bamenda power plant (MW) | 14 | 0 | 100 |
Oyomabang power plant (MW) | 12 | 0 | 100 |