| Peak period | Initial case | Final case | Performances (%) |
| Bekoko transformer (%) | 93 | 62 | 33.33 |
| Oyomabang-Ngousso line (%) | 130 | 81 | 37.69 |
| Mangombe-Dibamba line (%) | 104 | 44 | 57.69 |
| Necessary Capacitor banks | 7 | 3 | 57.14 |
| Power losses (MW) | 59.88 | 48.85 | 18.42 |
| Limbe power plant (MW) | 44 | 12 | 72.73 |
| Bamenda power plant (MW) | 14 | 0 | 100 |
| Oyomabang power plant (MW) | 12 | 0 | 100 |