Peak period

Initial case

Final case

Performances (%)

Bekoko transformer (%)

93

62

33.33

Oyomabang-Ngousso line (%)

130

81

37.69

Mangombe-Dibamba line (%)

104

44

57.69

Necessary Capacitor banks

7

3

57.14

Power losses (MW)

59.88

48.85

18.42

Limbe power plant (MW)

44

12

72.73

Bamenda power plant (MW)

14

0

100

Oyomabang power plant (MW)

12

0

100