Scheme | Perforation position | Water flooding | Polymer flooding | |
Injection well | Production well | |||
1 | All part | All part | Until water cut 98% | / |
2 | Upper part | All part | ||
3 | Upper part | Upper part | ||
4 | All part | Upper part | ||
5 | All part | All part | Until breakthrough (Water cut greater than 30%) | Until water cut 98% |
6 | Upper part | All part | ||
7 | Upper part | Upper part | ||
8 | All part | Upper part |