| Scheme | Perforation position | Water flooding | Polymer flooding | |
| Injection well | Production well | |||
| 1 | All part | All part | Until water cut 98% | / |
| 2 | Upper part | All part | ||
| 3 | Upper part | Upper part | ||
| 4 | All part | Upper part | ||
| 5 | All part | All part | Until breakthrough (Water cut greater than 30%) | Until water cut 98% |
| 6 | Upper part | All part | ||
| 7 | Upper part | Upper part | ||
| 8 | All part | Upper part | ||