System Architecture | Electric Production | Electric Consumption & others | Greenhouse Gases | |||||
Components | Size | KWh/yr | % |
| KWh/yr | % | Pollutant | kg/yr |
PV (KW) | 700 | 906,452 | 3 | AC primary Load | 10,683,159 | 58.7 | Carbon dioxide | 1,619,880 |
Wind T. (Unit) | 10 | 28,756,407 | 92 | Deferrable Load | 7,519,853 | 41.3 | Carbon monoxide | 3587 |
Diesel Gen. (KW) | 1122 | 1,594,105 | 5 | Excess Electricity | 13,059160 | 41.8 | Unburned hydrocarbons | 397 |
Battery (Unit) | 650 | Cost Summary | Unmet Load | 482,691 | 2.6 | Particulate matter | 270 | |
Inverter (Kw) | 610 | TNPC ($) | 25,186,892 | Capacity Shortage | 781,923 | 4.2 | Sulfur dioxide | 3259 |
Rectifier (Kw) | 610 | LCOE | $0.11/Kwh | Thermal Load |
|
| Nitrogen oxide | 32,008 |
Disp. Strategy | LF | Oper. Cost | $820,919/yr |
|
|
|
|
|