| Labor-intensive | Capital-intensive | ||
Estimation method | Diff-GMM | Sys-GMM | Diff-GMM | Sys-GMM |
L. w
k
rc
firm
mr
cons
| 0.643 (1.326)
−0.312 (−1.630)
−0.828 (−1.496)
0.902 (1.000)
−2.265 (−1.449)
−13.96 (−1.129)
−13.10 (−1.233)
7.479* (1.673)
15.95*** (2.721) | 0.898*** (3.122)
−0.542** (−2.135)
−2.524** (−2.559)
1.574** (2.157)
−2.787** (−2.566)
−5.383** (−2.441)
−9.084*** (−2.646)
4.239 (1.470)
34.56*** (3.190) | 0.0921 (0.966)
−0.0628 (−0.587)
−0.0701 (−1.146)
−0.350*** (−3.011)
0.176 (0.258)
−0.0258 (−0.0481)
0.106 (0.0911)
0.322 (0.611)
7.428*** (3.445) | −0.0197 (−0.261)
−0.0414 (−0.344)
0.0632 (0.549)
−0.226** (−2.192)
1.227* (1.840)
0.693 (0.766)
2.476*** (3.163)
−0.0605 (−0.104)
2.651* (1.657) |
AR (1) AR (2) Sargan test Observed value | 0.005 0.085 0.0304 0.0241 0.773 0.230 0.2326 0.8586 0.9996 1.0000 0.9958 1.0000 120 132 140 154 |