Hydrologc

unit

Length of calibration and validation phase (month)

Calibration parameters

Validation parameters

Calibration phase

Validation phase

Incoming model

Outgoing model

Nash Criteria

X1

X2

X1

X2

Rising

(Q)

River module Q

Low water

ln(Q)

Assessment

Moukomo

01/1952-06/1954

(30 month)

07/1954-06/1957

(36 month)

6.00

1.00

8.76

1.01

75.8

77.7

78.1

100.2

Lekana

6.00

1.00

8.87

1.10

62.1

64.7

65.5

100.0

N’douo sub-basin

6.00

1.00

8.66

0.98

76.3

78.8

79.8

100.1

Makaka

6.00

1.00

8.96

1.29

45.9

49.0

50.6

99.4

Loudima

6.00

1.00

8.79

1.09

65.8

68.3

67.7

100.6

Makabana

6.00

1.00

8.69

1.02

74.6

76.6

77.4

99.9

Niari sub-basin

6.00

1.00

8.26

1.08

80.6

83.1

84.4

99.7

Sounda

6.00

1.00

8.67

1.04

60.5

68.2

72.6

99.7

Kouilou sub-basin

6.00

1.00

8.67

1.04

60.5

68.2

72.6

99.7

Kouilou- Niari basin

Ditto (sub-basins)

6.00

1.00

8.46

1.04

80.5

83.3

84.9

99.8