Breach Parameters | MacDonald and Langridge-Monopolis (1984) | Froehlich (2008) |
Volume Eroded Ver (m3) |
(earth fill) |
|
(rock fill) | ||
Breach Width B (m) |
|
Ko = 1.0 for piping Ko = 1.3 for overtopping |
Breach Side Slope (H:V) | 0.5:1 | 0.7:1 piping 1.0:1 overtopping |