Discharge classification

K

P

L(m)

Discharge routes

End-order drainage canal

1.203

0.910

300

in the block

Second, Third drainage canal

0.903

0.860

500

in the block

No. 3-1(1)

0.763

0.778

1845

T1-T2

No. 3-1(2)

0.976

0.753

1204

T2-T3

No. 3-1(3)

0.993

0.730

154

T3-T7

No. 3-2(1)

0.958

0.706

3386

T3-T9

No. 3-2(2)

0.893

0.707

1206

T9-T10

No. 3-3(1)

0.931

0.759

617

T7-T8

No. 3-3(2)

1.035

0.675

3121

T8-T10

No. 3-3(3)

1.520

0.670

187

T10-T11

No. 3-5(1)

1.063

0.810

584

T8-T13

No. 3-5(2)

1.247

0.664

5070

T13-T14

No. 2-4(1)

1.077

0.838

3315

T5-T6

No. 2-4(5)

1.077

0.838

2530

T6-T4

Yagoshi River

1.683

0.694

1600

T14-T12

Kurabe River

1.670

0.692

3170

T11-T15