Symbol

Definition

Unit

Data and equation

Promoted

Conventional

Cchip,i

Chipping cost of the supplier i

JPY/loose m3

Table 1

Equation (1)

xij

The amount of wood chip produced by the chipper i or round wood transported from the material landing j

loose m3

Variable

Ctr,ij1)

Transportation cost of the supplier i from the landing j to the demand or

the unit transportation cost of round wood from the material landing j in the conventional system

JPY/loose m3

GIS database

Table 4

D

Annual demand

loose m3

378,000

Vi

Annual production volume by the chipper i required for its depreciation

loose m3

Small: 9857e

Middle: 35,534e

-

Vj

Annual amount of material at the material landing j

loose m3

e z ( u 1 + u 2 ) V t i

e z u 1 V t i

e2)

Chip density coefficient

loose m3/ solid m3

2.8

z1)

Annual production rate by thinning in the model area

0.0067

u11)

Rate of treetop volume to stem volume without branches

0.4

u21)

Rate of branches to stem volume

0.23

-

Vt,j

Stock volume in the municipality j

solid m3

GIS database