Item

Test ID

Test year

Test condition

Major thermal-hydraulic phenomena

Station blackout (SBO)

TR-LF-16

2015

SBO transient with loss of primary coolant with AM measures

Steam discharge through SG RVs, and single- and two-phase natural circulation

Loss of reactor shutdown functions

TR-LF-13

2007

LOFW transient without scram with delayed actuation of AFW system

Two-phase natural circulation

Loss of ECCS water injection functions

SB-CL-41

2011

LOCA with 8-in. break at cold leg with AM measures under totally failed HPI system

Critical flow at break, steam discharge through SG RVs, loop seal clearing, core boil-off, and steam condensation on ACC water

Loss of heat removal functions from secondary cooling water system

TR-LF-07

1992

Total LOFW transient with primary feed-and-bleed operation

Coolant discharge through PZR PORV, two-phase flow in PZR, two-phase stratified flow in hot leg, and steam condensation on ACC water

Loss of ECCS recirculation functions

None

Expected; steam binding, core liquid level reduction, and core reflooding