Parameter | Range | Parameter | Range |
Inventory cost | U (10, 20) | Processing time | U (50, 80) |
Backorder cost | U (20, 30) | Setup time | U (250, 300) |
Setup cost | U (500, 600) | Demand | U (20, 50) |
Production cost | U (80, 100) | Production capacity | U (30, 60) |