| Gen. Bus No. | Before the outage | After the outage | Cost deviation ($/hr) | ||
| Generation (MW) | Cost ($/hr) | Generation (MW) | Cost ($/hr) | ||
| 1 | 199.28 | 8915.04 | 129.88 | 9490.38 | 575.34 |
| 2 | 37.22 | 40.75 | |||
| 5 | 35.99 | 66.21 | |||
| 8 | 15.09 | 29.69 | |||
| 11 | 6.33 | 24.03 | |||
| 13 | 0 | 3.98 | |||