Ordering Cost | Number of Cycles | Cycle Time (Days) | Total Variable Cost ($) |
100 | 5.917159763 | 61 | 1184.88 |
200 | 4.201680672 | 86 | 1676.65 |
300 | 3.424657534 | 106 | 2054.389 |
400 | 2.96735905 | 122 | 2373.1 |
500 | 2.652519894 | 136 | 2654.1 |