| Evaluation index |
|
|
|
| Drilling work (105 m) |
|
|
|
| Construction time (103 days) |
|
|
|
| Total investment (RMB 106) |
|
|
|
| Control cost (Yuan/t) |
|
|
|
| Prevention of secondary disaster (%) |
|
|
|