Construct | Item | Loadings | Average Variance Extracted (AVE) | Composite Reliability (CR) |
Direct Instruction | TP_DI11 | 0.779 | 0.698 | 0.902 |
TP_DI12 | 0.871 | |||
TP_DI13 | 0.860 | |||
Design & Organization | TP_DO1 | 0.863 | 0.702 | 0.876 |
TP_DO2 | 0.884 | |||
TP_DO3 | 0.811 | |||
TP_DO4 | 0.779 | |||
Facilitation | TP_F10 | 0.746 | 0.640 | 0.914 |
TP_F5 | 0.730 | |||
TP_F6 | 0.814 | |||
TP_F7 | 0.833 | |||
TP_F8 | 0.822 | |||
TP_F9 | 0.847 |