| Construct | Item | Loadings | Average Variance Extracted (AVE) | Composite Reliability (CR) |
| Direct Instruction | TP_DI11 | 0.779 | 0.698 | 0.902 |
| TP_DI12 | 0.871 | |||
| TP_DI13 | 0.860 | |||
| Design & Organization | TP_DO1 | 0.863 | 0.702 | 0.876 |
| TP_DO2 | 0.884 | |||
| TP_DO3 | 0.811 | |||
| TP_DO4 | 0.779 | |||
| Facilitation | TP_F10 | 0.746 | 0.640 | 0.914 |
| TP_F5 | 0.730 | |||
| TP_F6 | 0.814 | |||
| TP_F7 | 0.833 | |||
| TP_F8 | 0.822 | |||
| TP_F9 | 0.847 |