Aspect

1 (0 + 200)

2 (0 + 400)

3 (0 + 600)

4 (0 + 800)

5 (0 + 1000)

Number of non complying segments

Weight Factor

Percentage of non compliance

Insert X if a segment does not comply

(1)

(2)

(3) = (1) × (2)

(A) Pavement/shoulder/roadside

Patch work

x

1

10

10

Cracks/rutting/raveling

x

1

6

6

Pavement edge break

x

1

6

6

Cleanliness

0

3

0

Shoulder

0

4

0

Embankment slopes

0

4

0

Vegetation control

x

1

3

3

Obstruction on road

0

2

0

Sub total (A)

38

25

(B) Bridges and structures

Bridge maintenance

0

7

0

Retaining and protection wall

0

7

0

Waterway maintenance

0

6

0

Sub total (B)

20

0

(C) Drainage system

Longitudinal drains

0

4

0

Culverts and cause ways

0

10

0

Sub Total (C)

14

0

(D) Signaling and road safety

Sign maintenance

0

6

0

Kilometer/delineators/guideposts/ confidence blocks

0

4

0

Road marking

X

1

8

8

Sub total (D)

18

8

(E) Provision of maintenance services

Sub total (E)

10

0

Total A + B + C + D + E

100

33