Title of the study: Water treatment process

Worksheets: 4/4

Drawing N˚:

Date: 26/05/2021

Line-up: CE, CL, CDME, CDMM, CG, SMH

Meeting date: 20/05/2021

Party considered: Transfer duct from the supply tank of the diaposime to the boilers

Material: Diaposime B117

Activity: Transfer continuously at a rate greater than that of NaCl Destination: Streamers

Source: Diaposime B117 tank

Operating parameters: Pressure, temperature and flow

Word guide

Element

Deviation

Causes

Consequences

Barriers security

G

P

R

Events

Corrective action

Resp

10

Inverted

Transfer Diaposime B117

Inversion of the direction of flow. The treated water flows from the coils to the tank supply

Pressure in the coils superior to the pressure evacuation the pump

Contamination of tank supply by reflux material from reaction

None apparent

3

0.067

0.201

Unacceptable situation

Provide installing a check valve in driving

CE

11

Other than

Diaposime B117

Other than Diaposime B117. Material other that the Diaposime B117 in the tank supply

Bad material in the tank supply

unknown Function of material

Controls and analyzes of the nature of content of the tanker before unloading

4

0.133

0.532

Acceptable situation

CE, CL

12

Other than

Reactor of destination

External leak Nothing happens to boilers

Conduct break

Contamination of the environment and risk of explosion

Integrity of pipelines

4

0.133

0.532

Acceptable situation

Specify that the detector flow proposed is enough fast to release to avoid a explosion

CDME,

CDMM