Title of the study: Water treatment process | Worksheets: 3/4 | |||||||||||
Drawing N˚: | Date: 26/05/2021 | |||||||||||
Line-up: CE, CL, CDME, CDMM, CG, SMH | Meeting date: 20/05/2021 | |||||||||||
Party considered: Transfer duct from the supply tank of the diaposime to the boilers | ||||||||||||
Material: Diaposime B117 | Activity: Transfer continuously at a rate greater than that of NaCl Destination: Streamers | |||||||||||
Source: Diaposime B117 tank | ||||||||||||
Operating parameters: Pressure, temperature and flow | ||||||||||||
N˚ | Word guide | Element | Deviation | Causes | Consequences | Barriers security | G | P | R | Events | Corrective action | Resp |
7 | In addition to | Diaposime B117 | In addition to D, a other fluid is also present in the tank supply. | procurement of tank contaminated | Unknown | Verification and analysis content from all feed tank before unloading in the supply tank. | 4 | 0.4 | 1.6 | Unacceptable situation | Check the procedure of operation | CL |
8 | In addition to | Diaposime transfer | In addition to the Diaposime transfer, something is passes: corrosion, erosion, crystallization or decomposition | Low level in The reservoir | Suction head positive net insufficient. turbulence possible and risk explosion Inadequate flow | Nothingness | 4 | 0.4 | 1.6 | Unacceptable situation | Idem 5 | CL |
Nothingness | 4 | 0.4 | 1.6 | Unacceptable situation | Idem 5 | |||||||
Nothingness | 4 | 0.4 | 1.6 | Unacceptable situation | Idem 5 | |||||||
Nothingness | 4 | 0.4 | 1.6 | Unacceptable situation | Idem 5 | |||||||
9 | In addition to | Destination streamers | In addition to destination of the coils External leaks | Leak in the led, the valve or the seal mechanics of the pump | Contamination of the environment. Risk of explosion | Use a code or of a standard approved for the Pipelines | 4 | 0.4 | 1.6 | Unacceptable situation | Position the flowmeter for the release as close as possible coils | CE, CDMM |