Title of the study: Water treatment process | Worksheets: 2/4 | |||||||||||
Drawing N˚: | Date: 26/05/2021 | |||||||||||
Line-up: CE, CL, CDME, CDMM, CG, SMH | Meeting date: 20/05/2021 | |||||||||||
Party considered: Transfer duct from the supply tank of the diaposime to the boilers | ||||||||||||
Material: Diaposime B117 | Activity: Transfer continuously at a rate greater than that of NaCl Destination: Streamers | |||||||||||
Source: Diaposime B117 tank | ||||||||||||
Operating parameters: Pressure, temperature and flow | ||||||||||||
N˚ | word- guide | Element | Deviation | Causes | Consequences | Barriers security | G | P | R | Events | Correctives action | Resp |
4 | More than | Diaposime transfer B117 | Excess transfer. Increased flow of diaposime B117. | Incorrect sizing of the pump. Installation of a bad pump. | Reduction possible performance. The product contain way too much of B117 diaposime. | Nothingness | 2 | 0.133 | 0.266 | Acceptable situation | Check the flows and the characteristics of the pump during commissioning. Review the setting procedure in use | CDME |
5 | Less | Diaposime B117 | Less diaposime B117 | Low level in The reservoir | Suction head positive net insufficient. turbulence possible and risk explosion Inadequate flow | Nothingness | 4 | 0.133 | 0.532 | Unacceptable situation | Low level alarm in the tank Idem 1 | CL, CE |
6 | Less | Diaposime Transfer Rate < NaCl Transfer Rate | Decrease of the flow of diaposime B117. | Pipe partially clogged, leaking, pump no performance, etc. | The tank is going exceed the limit filling | None apparent | 4 | 0.133 | 0.532 | Unacceptable situation | Idem 2 | CE, CDMM |