Title of the study: Water treatment process

Worksheets: 1/4

Drawing N˚:

Date: 26/05/2021

Line-up: SMH, CE, CL, CDME, CDMM, CG,

Meeting date: 20/05/2021

Considered part: Transfer duct of supply tank from Diaposime to coils

Material: Diaposime B117

Activity: Transfer continuously at a rate greater than that of NaCl Destination: Streamers

Source: Diaposime B117 Tank

Operating parameters: Pressure and temperature

Word guide

Element

Deviation

Causes

Consequences

Barriers security

G

P

R

Events

Correctives action

Resp.

1

Do not do

Diaposime B117 (D)

No Diaposime B117

Empty supply tank

No flow of D in the coils. Explosion

None apparent

5

0.133

0.665

Unacceptable situation

Plan the installation for the B117 diaphragm tank of a low level alarm. As well as a low threshold trigger for shutting down the NaCl (Salt) pump.

CL, CE

2

Do not do

flow D > flow Salt (S)

No transfer takes place

Pump D stopped, duct clogged

Explosion

None apparent

5

0.133

0.665

Unacceptable situation

Flow measurement of material D, as well as a low level alarm and triggering of the S pump in case of low flow

CDME,

CDMM,

CE

3

More than

Material D

Material tank D full

Filling the tank from a tank, so that the ability is insufficient.

The tank is going exceed the limit filling

None apparent

2

0.133

0.266

Acceptable situation

Anticipate an alarm high level if not determined previously

CL