Time, s | Event |
0 | RCP #3 is switched off |
2 | Control rod bank #7 drops into the core within 4 s |
3 | PZR heater (Group #1) is on |
10 | Bank #12 moves in at a rate of 2 cm/s |
13 | PZR heaters (Group #3, 4) are on |
23 | Reverse flow from cold leg to hot leg of loop #3 started |
35 | Temperature in hot leg #3 decreases lower than cold leg |
55 | Mass flow rate through reactor core reaches steady state |
285 | PZR heaters (Group #3, 4) are off |
350 | PZR water level and core pressure are stabilized |
420 | End of transient |