Cases | Power Output (KW) | Fresh Water Production (ton/d) | Performance Ratio KW/(ton/d) |
Case study 1 (Shafaghat, [17] ) | 650,000 | 212,289.03 | 3.06 |
Case study 2 (Kotb, [18] ) | 42,000 | 2,480.00 | 16.94 |
Case study 3 (Jammoul & El-Samni, [19] ) | 1000 | 327.37 | 3.05 |
Proposed design in the paper | 1000 | 236.95 | 4.22 |