Cases

Power Output (KW)

Fresh Water Production (ton/d)

Performance Ratio KW/(ton/d)

Case study 1 (Shafaghat, [17] )

650,000

212,289.03

3.06

Case study 2 (Kotb, [18] )

42,000

2,480.00

16.94

Case study 3 (Jammoul & El-Samni, [19] )

1000

327.37

3.05

Proposed design in the paper

1000

236.95

4.22