Objectives | Single objective | Two objectives | Three objectives | ||||
Cost | Loss | VSI | Cost-loss | Cost-VSI | Loss-VSI | Cost-loss-VSI | |
Cost ($/hr) | 128945 | 152014 | 149156 | 131992 | 131129 |
| 131119 |
Loss (MW) | 139.5 | 123.3 | 138.6 | 115.4 |
| 125.12 | 143.5 |
VSI (p.u.) | 0.47 | 0.479 | 0.412 |
| 0.431 | 0.429 | 0.442 |
Execution time (s) |
|
|
| 35.487 | 35.897 | 35.127 | 48.087 |