| Acceleration factor | 1 | 1.5 | 2 | 2.5 | 3 |
| Cost ($/hr) | 803.7 | 802.4 | 801.9 | 801.7 | 801.9 |
| Loss (MW) | 5.41 | 5.322 | 5.24 | 5.21 | 5.91 |
| VSI (p.u.) | 0.151 | 0.15 | 0.149 | 0.14 | 0.153 |