Materials | Quantity | Unity | Unit price $ | Total price |
Rebar | 177 | Ton | 365 | 64,605 |
Sand | 6970.63 | m³ | 0.8 | 5577 |
Gravels | 3933.827 | m² | 20 | 78,677 |
Cement | 1573.531 | Ton | 4250 | 7,474,272 |
Bulldozer | 6970.63 | m³ | 0.8 | 5577 |
Pre-Constructed metal sheets: to protect the internal face of the wall against corrosion; 1.3 of Vd: | 1408.2 | m² | 150 | 71,075 |
Cement: Sand | 01:04 | kg | done | |
Heating tubes: Hot tube heater | 232,489.16 | pce | 60 | 13,949,349 |
Miscellaneous: The filling indicator, tubes, measuring devices and meters electricity network, fiber cables, welding rods, mixing… | N/A | N/A | N/A | 5000 |
Biogas electricity generator Samsung 10 - 1000 | 3 | pce | 10,000 | 30,000 |
Sheets of foam for the insulation | 4224.6 | m² | 3.6 | 5109 |
Painting the insulation using the Petroleum Albumen | 4224.6 | m² | 59/barrel | 210 |
Total $ | $110,316,035 |