Evaluation (Interlocking) | Unit | (%) | World-class (Italy/Cp flight) | Domestic | Target | Method | Figure | Results | |
Light control | OFFSET | 10% | All functions | C | A | Real time (±0.5 sec) | +0.2 sec | A | |
Normal operation | Verifictation of Data | ||||||||
Data Linkage | |||||||||
Oxygen System | OFFSET | 10% | All functions | C | A | Real time (±0.5 sec) | +0.1 sec | A | |
Normal operation | Verifictation of Data | ||||||||
Data Linkage | |||||||||
Air control system | OFFSET | 10% | All functions | C | A | Real time (±0.5 sec) | +0.2 sec | A | |
Normal operation | Verifictation of Data | ||||||||
Data Linkage | |||||||||
Electrical control | OFFSET | 10% | All functions | C | A | Real time (±0.5 sec) | +0.2 sec | A | |
Normal operation | Verifictation of Data | ||||||||
Data Linkage | |||||||||
Fuel control | OFFSET | 10% | All functions | D | A | Real time (±0.5 sec) | +0.1 sec | A | |
Normal operation | Verifictation of Data | ||||||||
Data Linkage | |||||||||
Hydraulic system | OFFSET | 10% | All functions | B | A | Real time (±0.5 sec) | +0.1 sec | A | |
Normal operation | Verifictation of Data | ||||||||
Data Linkage | |||||||||
Engine start control | OFFSET | 10% | All functions | C | A | Real time (±0.5 sec) | +0.1 sec | A | |
Normal operation | Verifictation of Data | ||||||||
Data Linkage | |||||||||
Indicator | OFFSET | 10% | All functions | C | A | Real time (±0.5 sec) | +0.1 sec | A | |
Normal operation | Verifictation of Data | ||||||||
Data Linkage | |||||||||
Dimention | mm | 10% | - | B | A | (Tolerance ±0.5 mm) | ±0.2 mm | A | |
Verifictation of Data |