Globally Optimal | ||
Fab1 | Fab2 | |
Volume | ||
PROD 1 | 4000 | 0 |
PROD 2 | 0 | 5000 |
PROD 3 | 3000 | 2000 |
Cost | 12,750,000 | 13,500,000 |
Total Cost | 26,250,000 |