| 1 | Start Project |
| 2 | Workshop equipment |
| 3 | Excavation |
| 4 | Revetment |
| 5 | Performing lean concrete |
| 6 | Foundation and structure work |
| 7 | Roof insulation |
| 8 | Door frame Slope roof |
| 9 | Run drains |
| 10 | Plaster and white wash |
| 11 | Performing electrical facilities |
| 12 | Concrete flooring and Stained concrete work |
| 13 | Bath room insulation |
| 14 | Floor ceramic and tile work |
| 15 | Installing elevator guide rail |
| 16 | Outlook painting |
| 17 | Installing windows |
| 18 | Performing the pipes and electrical installation |
| 19 | Performing fire sprinklers |
| 20 | Gas piping |
| 21 | Masonry of area and stares |
| 22 | Installing elevator |
| 23 | Performing non-structural ceiling |
| 24 | Installing fence and metal doors |
| 25 | Installation of wooden doors |
| 26 | Internal painting |
| 27 | Dismantling workshop |
| 28 | Finish |