Component

Cost without subsidy (MAD)

Percentage

Investment cost (MAD)

Percentage

Amortized value with subsidy (MAD/year /ha)

Amortized value without subsidy (MAD/year /ha)

% variation

Construction

337,400.00

9%

337,400.00

20%

383.33

383.33

0%

Equipment

834,000.00

22%

709,000.00

42%

3632.50

4170.00

13%

Drip irrigation system

1,594,000.00

42%

318,800.00

19%

1230.17

6150.83

80%

In vitro plants

1,033,200.00

27%

333,200.00

20%

1136.00

3936.00

71%

Total

3,838,600.00

100%

1,698,400.00

100%

6582.00

14,840.17

0.56