Variable

Correlation

Practices

Purchasing-Cost

Purchasing-Quality

Purchasing-Availability

Cost-Intent

r =

0.678

0.055

0.561

p =

0.000

0.765

0.051

Quality-Intent

r =

0.221

0.844

0.005

p =

0.102

0.000

0.871

Availability-Intent

r =

0.522

0.023

0.425

p =

0.061

0.867

0.033