Dam Name

Parameter

The settlement set of the

Instrumentation (cm)

The settlement

Modeling (cm)

AghChay

M1 Bottom

40

40

M2 A third of dam body height

65

62

M3 Two third of dam body height

91

87

Narmashir

M1 Bottom

35

35

M2 A third of dam body height

46

42

M3Two third of dam body height

58

53

Gilan-e Gharb

M1 Bottom

15

15

M2 A third of dam body height

28

26

M3Two third of dam body height

33

32