|
|
Identification |
Planning |
Design |
Implementation |
Monitoring and Evaluation |
| Erusu |
37.% |
0% |
12.5% |
0% |
22.2% |
| Ibaram |
25% |
25% |
0% |
0% |
0% |
| Iyani |
0% |
0% |
20% |
40% |
40% |
| Ikaram |
10.3% |
10.3% |
0% |
20% |
17.2% |
| Ase |
0% |
0% |
100% |
0% |
0% |
| Gedegede |
25% |
0% |
50% |
0% |
25% |
| Ajowa |
16.3.% |
41.9% |
18.6% |
2.3% |
20.9.% |