| Test Cases | Faults | Cost/Effectiveness (%) |
PPC | 17,985 | 67 | 0.97 |
EPC | 1456 | 34 | 0.96 |
EC | 894 | 25 | 0.95 |
ICP | 19,972 | 78 | 0.98 |