Estimate

Std Deviation

Error

Z-Value

P-Value

Intercept

−1.82

0.69

−2.64

0.00828**

Govt Directive

0.83

0.35

2.35

0.01881*

Soil

−0.92

0.51

−1.81

0.06968

Infrastructure

1.53

0.36

4.2

2.62e−05***

Water Sources

1.13

0.48

2.32

0.02016*

Agriculture

0.7

0.3

2.364

0.01837*

Slope

0.47

0.3

1.62

0.1064