General data of the dam

Units

Annual average discharge

667 m3/s

Maximum Probable Flood at Mosul Dam

27,000 m3/s

Flood with (0.1%) Probability at Mosul Dam

12,000

Design flood during operation (Routed through Mosul Dam to be passed through Badush Dam)

8000 m3/s

Maximum reservoir level (in case of Mosul Dam failure)

307 masl