Phase | Duration | Applied Volume (mm) | Intensity (mm/h) | Applied Volume (m3) | |
hours | min | ||||
Irrigation Pre Runoff | 0 | 50 | 12 | 14.4 | 0.600 |
Irrigation During Runoff | 2 | 15 | 33 | 14.7 | 1.650 |
Total irrigation | 3 | 5 | 45 | 14.6 | 2.250 |
Runoff | 2 | 15 | 200 | 88.9 | 10.000 |
Total Irrigat. + Runoff | 3 | 5 | 245 | 79.5 | 12.250 |