Phase

Duration

Applied

Volume (mm)

Intensity

(mm/h)

Applied

Volume (m3)

hours

min

Irrigation Pre Runoff

0

50

12

14.4

0.600

Irrigation During Runoff

2

15

33

14.7

1.650

Total irrigation

3

5

45

14.6

2.250

Runoff

2

15

200

88.9

10.000

Total Irrigat. + Runoff

3

5

245

79.5

12.250