| Sources: CI-ENERGIES—Côte d’Ivoire Electricity Sector Development Report—Registration Document—Page 52/103—February 2018 | Unité US $ (09/06/19) |
| Total Cost of Rural Electrification Master Plan [2015-2020]— Billions XOF | 578,4242 |
| Principle results | |
| Number of localities to be electrified | 4968 |
| Number of poles | 200 |
| Population covered over the project period [2015-2020] | 5,385,325 |
| Length of MV Networks (km) | |
| Investment (US $) | $993,907,240 |
| 1. MV networks (MV network) | $366,858,786 |
| 2. HTA reinforcement (HTA network) | $207,633,083 |
| 3. BTA Networks (Distribution Network) | $318,970,057 |
| 4. Transformers (MV network) | $59,126,157 |
| 5. Electric meters and connections (Distribution Network) | $41,146,273 |
| Indicators | |
| Cost of the Distribution network/locality (US $) | $84,389 |
| Cost of the HTA network/locality (M FCFA) | $127,540 $115,638 |
| Total investment/location (US $) | $200,062 |
| Total investment/capita (US $) | $185 |
| Average cost of connection/subscriber (US $) | $3517 |
| Average cost/km HTA network (US $) | $51,292,644 |