Parameters

Approaches

Hybrid TLBO-PSO [Proposed]

TLBO

[1]

PSO

[8]

Congestion cost ($/h)

939.3927

2916.4

3117.6

ΔPG1

−429.3075

−1.0174

NR

ΔPG2

+39.0969

−24.6365

NR

ΔPG3

−4.6236

+36.0991

NR

ΔPG4

−27.158

−6.2282

NR

ΔPG5

−2.0455

−0.2811

NR

ΔPG6

+3.2447

−1.2540

NR

ΔPG7

−29.7139

−2.5732

NR

Total power rescheduled (MW)

535.1899

72.089

76.314